top_la

facebook
rss
twitter
  • HOME
  • COMPANY
    • CEO greeting
    • History
    • Intellectual Property Rights
    • Qualification
    • Roadmap
  • PRODUCT
    • DVR
    • Fork Camera
    • Standard Camera
    • Shutter & Dual /Tilt Camera
    • Small Camera
    • Touch Type Monitor
    • Key Type Monitor
    • Accessory
  • TECHNOLOGY
    • Design Quality
    • Reliability
    • Production Quality
  • LEADING R&D
    • High Reliable Explosion-Proof camera
    • Integrated Monitor
    • Image Processing & Storage
  • CUSTOMER
    • After Service
    • Location
    • Eastern Story
  • New Products

Reliability


info_014Waterproof
IP68 level production test.
Total inspection conducted currently.
sub_03_01
IP68 level production test.
Total inspection conducted currently.
sub_03_02

 

140 bar test process for corresponding test of IP69K
sub_03_03
Application of quantity circulation test equipment.
sub_03_04

 


info_014Vibration

Proceed the vibration test which can meet standards of Hyundai motors ES96000-00, General motors W14011and JASO D001-94 through external test laboratory.
Making our own vibration test equipment for proceeding the test. Test result of automatic program, record management & automatic storage compared to vehicle driving conditions.

sub_03_05

 


info_014Constant temperature / Constant humidity test

Verify the products of function & appearance testing from -30 degree C to +85 degree C. Validation in pre-production stage and sampling inspection during production for preparing use of low temperature, high temperature & high humidity.

sub_03_06

 


info_014Thermal shock test

- Thermal shock test according to international standards
Products reliability test by rapid temperature change(Put products over 85 degree C zone for some period of time and move to -30 degree C zone in short period of time).

- Waterproof thermal shock test according to our own standards
Products waterproof airtight test by rapid temperature change(Put products over 85 degree C for some period of time and move to ice containing bucket immediately).

0001

 


info_014ESD test

Products test by ESD simulator in order to prevent any errors in the filed

sub_03_08

 

 

info_014Electrical test

Simulating various electrical test in order to minimize failure rate in the field as there are various of vehicles & different power consumption environment(such as Crank start, Reverse polarity and so on).

sub_03_09

eng_menu_03

Head office(factory) Business Registration No.:128-81-03963
(413-821)7 Keunyoundanggil,Jorieup,Pajusi,Kyoungkido
TEL : 82-31-947-2900 / FAX : 82-31-947-1388
Seoul office(Sales office): (138-759)75 Baekjaegobunro,Songpagu,Seoul(Olympia building 5F,Jamsildong)
TEL : 82-2-424-0541 / FAX : 82-2-424-0321 / E-MAIL : marketing@emastec.com
Copyright 2013 EASTERN MASTEC CORP. All rights reserved.